Anaerobic Baffled Reactor – maturation ponds – December 2019
- Organization : Save the Children International
Contact the author
Description of the treatment process
• A first physical treatment by filtering through a grid the object present,
• A second physical treatment in a sludge drying bed: a settlement tank to separate the sludge into a solid part and a liquid part, which is clearly the first module in terms of construction.
• A third physical treatment: a settler to polish the sedimentation,
• A first biological treatment: an Anaerobic Baffled Reactor (ABR) to degrade the suspended and dissolved solids,
• A second biological treatment: two aerobic maturation pond to remove pathogens, on which is added a polishing pond.
Description of the emergency context
Pauktaw is a zone that was directly affected by the October 2012 ethnic conflict. IDPs, Host Communities and isolated villages are facing an immediate need for water, sanitation and hygiene education as well as access to health and nutrition services. This is especially important given the crowded conditions in most of these neighborhoods.
Sin Thet Maw camp, in Pauktaw is supported for the WASH activities by Save the Children. In term of sanitation, around 430 latrines have been built for this camp hosting 682 households and 2523 beneficiaries.
The waterproof aspect of the latrine pits implies a filling of the latrines pits. Once the pit full, create another pit and latrine is not possible for a reason of land availability. Like for the Sittwe camps, desludging of the latrines and treatment of the sludge have been considered.
Community
• Dimensions or area: 800,000 square feet (7.5 hectares)
• Livelihood: mainly fishery
• Type of shelter/house: long house shelter
• HHs dimensions: average of 3.7 individuals per household
• Living area of community: Sin Thet Maw IDP camp, 20° 4’4.33″N, 92°59’33.56″E, 35min boat trip from Sittwe Golden River Jetty)
• Population increase/decrease forecast: 6-10% annual growth
• Type of site: semi-permanent camp
• Type of context: rural
• Other WaSH activities implemented in the community: hygiene promotion, water treatment and distribution, drainage, solid waste management.
• Local and international WaSH institutions with WaSH active role in the community and specific partnerships: only Save The Children is the WASH service provider
• Main waterborne diseases: AWD
Indicators
Narrative
During the monsoon 2014, temporary piezometer have been set to ensure the highest groundwater level into the compound. The groundwater level measurement is 2.5 feet from the surface:
Inlet sludge parameters measured and their mean value: CODin = 35,000 mg/l ; BODin = 8,000 mg/l
Type of containment pits
Mean number of users per pit: 14.4 user per pit
Flush or dry toilet: dry
Type of material for anal cleansing: water
Presence of solid waste in the pits: yes
Desludging and transportation system: motorized desludging
Distance between the plant and the latrines desludged
Desludging organizations: formal, well equipped, covering the needs
Local safety requirements
• integrated overall (covering the hair)
• Rubber gloves,
• Boots,
• Masks,
• Bathing space
Production of sludge per person per day considered for the design: 1.92L
Design time life of the plant: years
Design formulas used: See design in annex – BORDA formulas were used.
Reference documents used for the design of the plant: Decentralised Wastewater Treatment Systems (DEWATS) and Sanitation in Developing Countries
Special skills necessary for the design: Civil engineering / hydrogeology / biology / fluid mechanics
Mitigation of the local constraints: high water table, flood prone area, earthquakes.
Type of climate: tropical monsoon climate
Construction material of the different treatment modules
• Cement
• Sand
• Gravel
• Bricks
• Iron bars
• PVC pipes & fittings
• GI pipes & fittings
• Clay (bricks)
• Zinc sheetings
• Wooden beams / timber
Construction and installation methodology: camp based contractor
Time needed for construction and installation: 7 months
Area of the total land used and area of the treatment modules: 1,725m2
Special skills necessary for the construction of the plant: Masons, carpenters, civil engineer, hydrogeologist, environmental health specialist
Number of workers needed to operate and their skill level: 6 workers operate and maintain the plant on a regular basis.
Spare parts needed and availability locally/internationally: STS require fuel (for the pumps), water testing consumables and minor maintenance budgeted for a cost of $ 200 monthly.
Social acceptance: Good because STS is settle at a reasonable distance of the households’ shelters
Washing facilities available: Bathing space
Access to the plant: Walking or tractor
Site protected by a fence: Yes
Strengths
Well designed
Good location
Treatment capacity is sufficient
Weaknesses
NC
Lessons learned
Were you able to reduce the inlet quantity of sludge of the plant? How? Not needed
Were the design hypotheses correct? Yes
Have the design rules given the expected results? Yes
How have you reduced contact between staff and sludge? Safety equipment
What good practices would you recommend? A design with sufficient treatment capacity
Construction period not during water scarcity period and neither during monsoon.